Doc.No.: 03118-100-CO
Page 4 of 11
6 TEST PLAN
6.1 Test philosophy
An internal Pre-FAT testing of the Public Address System will be conducted at Zenitel's premises
prior to the FAT. The Pre FAT test results will be available during FAT.
The client will thus have the option to select only a number of Access units and Amplifiers for
verification, as testing of all interfaces is very time consuming.
All check/tests recorded shall end up in a status Pass or Fail. Any deviations or discrepancies shall be
recorded in the FAT Report - Punch List.
6.2 Scope of test
The testing will demonstrate that the equipment has been built and configured to meet the functional
requirements of the Specification, and in accordance with the provided documentation.
The tests will also show that the basic performance requirements (e.g. Signal Levels and functions) are
met.
7 SPECIFIC TEST PROCEDURE
7.1 General checks
The Equipment check will be performed with reference to the Equipment List, and furthermore to be
verified against “Mechanical layout (ML)” drawing.
PA Control & amplifier cabinet / rack A
PA Control & amplifier cabinet / rack B
MPA 1601 - Navigation Bridge (User 1)
MPA 1603 - Navigation Bridge (User 1)
MPA 1601 - Alternative Position (User 2)
MPA 1603 - Alternative Position (User 2)
(Loudspeaker network is a separate issue)