EasyManua.ls Logo

Zip Hydroboil HS010 - Installation Requirements

Zip Hydroboil HS010
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 5 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03
Safety
Thisapplianceisnotintendedforusebypersons(includingchildren)withreducedphysicalsensory
ormentalcapabilities,orlackofexperienceandknowledgeunlesstheyhavebeengivensupervision
or instruction concerning use of the appliance by a person responsible for their safety.
Childrenshouldbesupervisedtoensurethattheydonotplaywiththeappliance.
Pleasereadallinstallationrequirements,installationproceduresandprecautionsbeforeinstallingany
ZipHydroboilinstantboilingwaterheater.
NeverattempttoinstallanyZipHydroboilinstantboilingwaterheaterwithoutreadingalloftheapplicableinstructions.
Careshouldbetakentoavoidtouchingthemetalbodyofthetapwhichcanbecomeveryhot.
InsomehardwaterareaswheremineralscaleaccumulationintheboilingchamberoftheZipHydroboilmaybecome
aproblem,considerationshouldbegiventothemaintenancerequired.Asuitableformofwatertreatmentmaybe
necessary.
Astheinstaller,itisyourresponsibilitytosupply(ifnecessary)andinstallallvalvesasrequiredbylocalregulationsand
relevant standards.
TheplumbinginstallationmustbedoneinaccordancewithlocalWaterAuthorityregulationsandtheseInstallation
Instructions.
Read These Warnings First Cont.
This appliance must be earthed.
Ifthepowercableisdamageditmustberepairedonlybyaqualifiedtechnician.Toavoidhazards,allinstallation
proceduresmustbecarriedoutbyasuitablyqualifiedtradesperson.Thepowercableandpoweroutletmustbeinasafe
visible position for connection.
Thepowercablemustbeadequatelysecured.
Donotremovethecoveroftheheaterunderanycircumstanceswithoutfirstisolatingtheheaterfromthepowersupply.
Theappliance,itswiringandpipingmustnotbemodiedinanyway.
Theappliancemustbecompletelylledwithwaterbeforebeingswitchedon.
Incaseofmalfunctionisolatethepowersupplyimmediately.Incaseofleaksalsoisolatethewatersupply.Repairsmust
onlybecarriedoutbyZipHeaters(UK)LtdoranauthorisedZipserviceengineer.
Lifting
TakecarewhenliftingtheZipHydroboilunit.Someunitsmayexceedsafeliftinglimits.Ifyoufeelthisisbeyondyour
personalcapabilities,pleaseseekassistancewiththelift.Seespecificationsonpage4forweights.
Operating Conditions:
Theambienttemperaturesthisunitshouldoperatewithinis5ºC-50ºC.
Frostprotection:Ifthisheaterislocatedwhereambientairtemperaturecouldfallbelow5ºC;whentheheaterisnotin
use,donotturnofftheapplianceelectrically.Thissafeguardwillprotecttheunitfromfrostdamagebutdoesnotoffer
thesameprotectiontotheconnectingpipeworkandfittings.
Thisheaterisintendedonlyforindooruseandshouldneverbeinstalledoutdoorsorbeexposedtotheelementsofnature.
Thisunitmustnotbepositionedinanareathatmaybecleanedbyawaterjet.Thisunitmustnotbecleanedbyawaterjet.
Cleaning:
Hydroboil should only be wiped clean with a damp cloth. Never use abrasive cleaning agents or solvents on any
part of the Hydroboil, particularly the tap.
Installation Requirements
Beforeinstalling,ensurethatthefollowingareavailable:
a. Sufficientspacetopositiontheheatersothereisatleast150mmclearanceabovetheheaterforserviceaccess,
65mmtoitsleftand20mmtoitsright–thetapoutletusuallyshouldbepositionedatleast200mmabovea
draining board or drip tray.

Related product manuals