EasyManua.ls Logo

Zodiac EIXPERT - EiXpert Installation; Install the cell

Zodiac EIXPERT
12 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Informaon before installaon
Carton Contents:
1 x Power Pack (control box)
1 x Electrolyc Cell
1 x Owner/Operators Manual
1 x Installaon Screw Set
1 x Power Pack Hanging Template
Technical specicaons
Power supply voltage 220 - 240 Vac-50 Hz
Electric power
Max. 140 W
Protecon index IPX3
Control box size (W x L x D) 285 x 405 x 115 mm
Weight (box + cell) Minimum 7.1 kg
EiXpert Installaon
B
o
o
s
t
L
o
w
B
a
c
k
S
e
le
c
t
Install the cell
(a) Cell MUST be installed horizontally downstream of the heater and lter. It MUST be the last piece of
equipment in the return line to the pool.
(b) The posion of the cell, relave to other equipment, should be such that gases generated under normal
operaon should not accumulate in any receptacle or pipework. Thus, the cell should be posioned in-line
AFTER all receptacles where gases in excess of 2 litres may accumulate under normal operaon. e.g. lter
tanks, header tanks, solar systems, by-pass pipe loops, heaters, etc.
(c) If a valve is required aer the cell it should always be a non-return valve not a manually operated version.
Torque = 1.2 N.m (= 12.2 kg.cm)

Related product manuals