EasyManua.ls Logo

Zodiac pH Perfect - Installing the Sensor; Sensor Positioning Requirements; Correct vs. Incorrect Placement

Zodiac pH Perfect
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the Sensor
Important: the length of pipe between the sensor and the injection point must not be less than 60cm.
The sensor must be vertical, or at 45° max and always above the pipe. In no circumstances should
it be positioned horizontally or below the pipe.
The sensor should be positioned in such a way as to analyze the pool water nearest to it and thus before
any treatment.
Installation Instructions
Correct Positions
Incorrect Positions

Other manuals for Zodiac pH Perfect

Related product manuals