EasyManua.ls Logo

ABB A130 - Figures

ABB A130
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / A130-M.. - A145-M..
 Figures
© Copyright 2021 ABB. All rights reserved. HZTL4031_EN Revision N March 2021
Figures
Fig.1: Serial number(01) on the rating plate ........... 4
Fig.2: Layout and function of the turbocharger...... 6
Fig.3: Compressor wheel cooling................................ 7
Fig.4: Volatile Corrosion Inhibitor (VCI)................... 10
Fig.5: Package with hygrometer................................ 11
Fig.6: Warning plate locations ................................... 17
Fig.7: Rating plate ........................................................ 18
Fig.8: Locations of the rating plates ........................ 19
Fig.9: Attachment of loads on the crane hook ....... 21
Fig.10: Attachment angle............................................ 21
Fig.11 .............................................................................. 25
Fig.12: Suspension of complete turbocharger unit....
30
Fig.13: Turbine cleaning nozzle.................................. 31
Fig.14: Removing the turbocharger.......................... 32
Fig.15: Loosening the clamping nut......................... 34
Fig.16: Turbocharger centre of gravity ................... 35
Fig.17: Inserting gaskets into the bracket.............. 36
Fig.18: Inserting the threaded rods .......................... 37
Fig.19: Requirements for threaded rods.................. 37
Fig.20: Placing the turbocharger on the bracket . 38
Fig.21: Preparing the clamping nut for the tighten-
ing procedure ............................................................... 40
Fig.22: Tightening pressure screws.......................... 41
Fig.23: Connecting the speed sensor...................... 42
Fig.24: Connecting the compressor cooling air in-
take ................................................................................. 42
Fig.25: Attaching the support................................... 43
Fig.26: Oil orifice.......................................................... 45
Fig.27: Layout and overview of speed measurement
system ............................................................................ 52
Fig.28: Replacing the speed sensor......................... 54
Fig.29: Noise insulation, bellows.............................. 56
Fig.30: Replacing the protective grid...................... 59
Fig.31: Carrying out wet cleaning of compressor. 67
Fig.32: Carrying out wet cleaning of turbine............ 71
Fig.33: Cleaning the filter silencer............................. 73
Fig.34: Compressor-end, non-rotating parts.......... 75
Fig.35: Turbine end, non-rotating parts................... 76
Fig.36: Soaking the turbine end................................. 79
Fig.37: Swivel lifting eyes ............................................ 90
Fig.38: Starpoint ring nut VRM................................... 91
Fig.39: Weights of assemblies ................................... 92
Fig.40: Removing the air inlets .................................. 93
Fig.41: Removing the insulation................................. 94
Fig.42: Removing the gas outlet casing................... 95
Fig.43: Dismantling the gas outlet flange ............... 96
Fig.44: Removing the gas outlet flange ................... 97
Fig.45: Removing the compressor casing ............... 98
Fig.46: Dismantling the wall insert ........................... 99
Fig.47: Press off the casing ...................................... 100
Fig.48: Removing insulation sheets........................ 101
Fig.49: Oil orifice......................................................... 101
Fig.50: Removing cartridge group 1........................ 102
Fig.51: Removing cartridge group 2........................ 102
Fig.52: Removing the nozzle ring............................. 103
Fig.53: Installing the cartridge group on the service
support .......................................................................... 104
Fig.54: Measuring clearance A and B ...................... 105
Fig.55: Nozzle ring compression PD ....................... 106
Fig.56: Installing the nozzle ring.............................. 107
Fig.57: Lifting the cartridge group and rotating it by
90°................................................................................... 108
Fig.58: Installing the cartridge group..................... 109
Fig.59: Turbine casing insulation / Burst protection.
110
Fig.60: Installing the compressor casing................ 112
Fig.61: Measuring clearances N and R ..................... 113
Fig.62: Installing the air inlets ................................... 114
Page 146 / 149Page 146 / 149

Table of Contents

Related product manuals