EasyManua.ls Logo

ABB A130 - Fig. 32: Carrying out Wet Cleaning of Turbine; Table 16: Wet Cleaning of Turbine, Parameters

ABB A130
152 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / A130-M.. - A145-M..
7 Periodic maintenance work / 7.3 Cleaning the turbine during opera-
tion
© Copyright 2021 ABB. All rights reserved. HZTL4031_EN Rev.N March 2021
Fig.32: Carrying out wet cleaning of turbine
u Fulfil prerequisites.
u Ensure that the water supply(01) is guaranteed.
u Open the stop valve(02) and set the required water pressure at the manometer (3) (see
cleaning parameters in the table (see Table15: Turbine wet cleaning, recommended oper-
ating state 70)).
If an optional flowmeter (04) is present, set the water volume flow V
W
on the basis of
the
cleaning parameters in the table (see Table16: Wet cleaning of turbine, parameters
71).
u Close the stop valve (02) after 10minutes.
u Wait for 10minutes; do not change the load during this stabilisation phase.
If the cleaning result is unsatisfactory or there is water leakage, contact an ABB Turbochar-
ging Service Station.
Product Temperature be-
fore turbine before
cleaning [°C]
Maximum temper-
ature before tur-
bine during clean-
ing [°C]
Water volume flow
V
W
[dm
3
/min]
1)
Injection time
[min]
A130 350 ... 430 530 4.0 10
A135 350 ... 430 530 5.5 10
A140 350 ... 430 530 8.5 10
A145 350 ... 430 530 12.0 10
Table16: Wet cleaning of turbine, parameters
1)
Corresponds to a water pressure p
WT
of 1.5bar (overpressure compared to atmosphere)
Page 71 / 149

Table of Contents

Related product manuals