EasyManua.ls Logo

ABB ACH580-01 - Power Wiring Torque for Frames R1-R2

ABB ACH580-01
90 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
32 ACH580 Installation, Operation and Maintenance Manual
ACH580-01 Installation
12. Connect the ground screen pig-tail for Embedded fieldbus, EFB (EIA-485) cables at
X5. (Ground only at drive end.)
13. Strip and connect the individual control wires to the drive terminals. Tighten the
screws to 0.4 lb-ft (0.5…0.6 Nm).
WARNING! To avoid danger or damage to the drive on IT systems and corner
grounded TN systems, see section Drive compatibility for various electrical power
systems on page 16.
Power wiring torque table
Frame size
R1 R2
lb-ft Nm lb-ft Nm
T1/U, T2/V, T3/W 0.7 1.0 1.1 1.5
L1, L2, L3 0.7 1.0 1.1 1.5
R+, R- 0.7 1.0 1.1 1.5
PE Ground 1.1 1.5 1.1 1.5
R1...R2
Typical Type 1
EMC
VAR
6
1
5
7
Relay Outputs
Digital
Inputs
Analog Inputs
and Outputs
9
9
1
Option Mounting
8A
8C
8B
ACH580_Inst_Op_Maint_Rev G.book Page 32

Table of Contents

Other manuals for ABB ACH580-01

Related product manuals