3. Align the BIO-01 module with the option module slot in the front of the drive.
4. Push the BIO-01 option module into position.
132 Electrical installation
Installing option modules
Note: In US deliveries, options are already installed at the factory.
Note: If you will install the FPBA
-01 module, see section FPBA-01 PROFIBUS DP
adapter module connectors on page 77 for suitable connector types.
Mechanical installation of option modules
See section Overview of power and control connections page 34 for the available
slots for each module. Install the option modules as follows:
WARNING! Obey the instructions in chapter Safety instructions on page 13. If
you ignore them, injury or death, or damage to the equipment can occur.
Note: Slot 2 in frames R1R5 is at U
DC
potential. You must disconnect power
supplies before installing or removing an I/O extension module.
Stop the drive and do the steps in section Precautions before electrical work on page
16 before you start the work.
1. Remove the front cover(s) if not already removed. See page 97 (R1…R4), page
105 (R5) or page 63 (R6R9).
The figures for frames R1…R5 (page 133) and R6…R9 (page 135) show an example
of installing option modules.
4
3
6
5. 
[ To be translated (TP-62)] If required, you can install fieldbus
module on top of the BIO-01 module.