30 Mechanical installation
Checking the delivery
Make sure that all items listed in
Unpacking the unit
(page 27) are present.
Make sure that there are no signs of damage. Before installation and operation, read
the information on the type designation label to make sure that the unit is of the
correct type. The label includes an IEC and NEMA rating, UL, C-UL, CSA and CE
markings, a type code and a serial number, which allow identification of each unit.
The first digit of the serial number is the manufacturing plant. The next four digits
are the manufacturing year and week, respectively. The remaining digits complete
the serial number so that there are no two units with the same serial number.
The type designation label is attached to the heat sink and the serial number label to
the upper part of the back plate of the unit. Example labels:
Before installation
Check the installation site according to the requirements below. Refer to
Dimensional drawings
(page 133) for frame details.
Install the drive in an upright position with the cooling section facing a wall.
Requirements for the installation site
Refer to
Technical data
(page 105)for the allowed operation conditions of the drive.
Wall
The wall should be as close to vertical as possible, of non-flammable material and
strong enough to carry the weight of the unit. Make sure that there is nothing on the
wall to inhibit the installation.
Floor
The floor/material below the installation should be non-flammable.