Mechanical installation
48
Checking the installation site
The material below the drive must be non-flammable and strong enough to carry the
weight of the drive.
See chapter Technical data for the allowed operating conditions.
Required tools
• Set of screw drivers
• Torque wrench with a 500 mm (20 in.) or 2 × 250 mm (2 × 10 in.) long extension
bar
• 19 mm (3/4 in.) socket, 17 mm (11/16 in.) magnetic-end socket
Moving and unpacking the unit
Move the transport package by pallet truck to the installation site.
The layout of the transport package is shown below.
1
2
3
4
5
6
B
B
C
Part no. Description
1 Drive module with factory installed
options and multilingual residual
voltage warning sticker
2 Output cable terminals with
fastening screws
3 Floor fastening brackets and PE
terminals with screws
4 • Control unit with control cable
clamp plate, control panel
options (+J400, +J410, +J414)
and factory installed optional
modules
• Delivery documents
• Printed Hardware Manual and
Quick Start-up Guide, other
printed manuals if ordered,
manuals CD
• Optional module manuals
5 Sheathing
6 PP cushion
7Pallet
6
6
6
7
A
D
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com

Table of Contents

Other manuals for ABB ACS850

Related product manuals