EasyManua.ls Logo

ABB ACS850 - Control locations and operating modes

ABB ACS850
145 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mechanical installation
53
Installing the drive control unit
The drive control unit can be fastened on a mounting plate through the fastening
holes in its back or by using a DIN rail. The following drawings show the control unit
with front cover but units without covers are installed in the same way.
Mounting through the fastening holes
1. Fasten the fastening screws in the wall.
2. Lift the unit onto the screws.
3aua0000038989
1
2
2
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com

Table of Contents

Other manuals for ABB ACS850

Related product manuals