EasyManua.ls Logo

ABB DCS 500B - Page 45

ABB DCS 500B
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6 - Exchange of Thyristors for Size A6
DCS 500 / DCS 600 Service Manual
VI A 6 - 5
3. Write down the direction and location of the thyristors to be re-
moved and mark their gate leads. In case of BCT’s add the po-
sition of the gates.
4. Remove the gate leads if possible.
5. Loosen the mounting clamp at the top of the thyristor stack.
Figure 6-4 Handling of indicating spring and mounting clamp
Attention: While loosen the mounting clamp the indicating spring
must be pulled out a little, otherwise the spring will be damaged!
Do not remove the nuts totally, otherwise the treaded rods will fall
down!
6. Pull out both DC-busbar plates.
Figure 6-5 DC-busbar plates
DC-
busbar
plates
mountin
g
clam
p
indicatin
g
s
p
rin
g
3ADW000093R0701_DCS500B/DCS600_Service manual_e_g

Table of Contents

Other manuals for ABB DCS 500B

Related product manuals