EasyManua.ls Logo

ABB DCS 500B - Page 97

ABB DCS 500B
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 10 - Service
DCS 500 / DCS 600 Service Manual
VI A 10 - 21
Note:
Additional information about the selection see Update.txt or Lotus
Notes database.
After clicking OPEN the download starts immediately and SDCS-
CON-x LED-display shows a small r.
DCS 500B download lasts about 10 minutes.
DCS 600 download lasts about 5 minutes.
After the download is finished the display shows a small u again
and the terminal program gives the message Program command
successful completed.
Switch off auxiliary supply (SDCS-POW-1).
Set jumper S2 5-6 back to position 3-4 (or 7-8 if two jumpers are
present).
Assemble the SDCS-AMC x board (only DCS 600). Take
care on the plastic washer of the screw near CH0.
The download of the SDCS-CON-x is finished now.
The firmware version can be checked with
signal 112.18 for DCS 500B and
signal 4.11 for DCS 600.
3ADW000093R0701_DCS500B/DCS600_Service manual_e_g

Table of Contents

Other manuals for ABB DCS 500B

Related product manuals