Maintenance 61
Reseal Cable Glands after Opening
If the pressure-proof cable glands, through which the data transmission
cable and the 24 VDC connecting cable are routed to the flameproof
cylinder of the EL3060-Uras26 analyzer unit, have been opened, the
external nuts must be screwed tight with a torque wrench (size 20);
tightening torque = 17 Nm.

Table of Contents

Other manuals for ABB EasyLine EL3060 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB EasyLine EL3060 Series and is the answer not in the manual?

ABB EasyLine EL3060 Series Specifications

General IconGeneral
BrandABB
ModelEasyLine EL3060 Series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals