34
Installation and commissioning guide
2750 515-1 EN, REV. 14, 2020-06-26
5. Loosen the nut (44).
G005067
6.
Turn the shaft (37) counter clockwise to remove the shaft-socket from the upper draw rod (35).
7.
Remove the hydraulic jack (38) from the bushing.
G005068
8.
Apply Molykote Multilub to the threads on the
pull-through cord (12), then connect it to the upper
draw rod.
NOTE!
The terminal on the pull-through cord
(12) has M8 threads.
NOTE!
Or use a lubricant with equal properties
to Molykote Multilub.
G004686