EasyManua.ls Logo

ABB IRB 6400R User Manual

ABB IRB 6400R
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image

Instructions for Levelmeter calibration (alternative method)
Calibration equipment
Levelmeter 2000
IRB 140 / IRB 1400 / IRB 2400 / IRB 4400
IRB 6600 / IRB 6650 / IRB 6650S / IRB 7600 / IRB 6400R

Other manuals for ABB IRB 6400R

Question and Answer IconNeed help?

Do you have a question about the ABB IRB 6400R and is the answer not in the manual?

ABB IRB 6400R Specifications

General IconGeneral
Payload Capacity150 kg
Degrees of Freedom6
Max Speed2.5 m/s
ControllerS4Cplus
MountingFloor
TypeArticulated Robot
ModelIRB 6400R
ManufacturerABB
InstallationIndustrial
ProtectionIP 67
Reach2400 mm

Summary

Overview

1.1. Introduction

Brief overview of the calibration method and useful facts.

1.2. How and when to calibrate the robot system

Overview of calibration procedures and conditions for calibration.

1.3. Calibration, prerequisites

Essential requirements and calibration order for the calibration process.

Reference Information

2.2. Calibration equipment, axis 1

Lists special calibration equipment for axis 1 calibration.

2.3. Calibration equipment, axes 2-6

Details calibration equipment for axes 2-6.

2.4. Calibration scales and correct axis position

Specifies calibration scale positions and correct axis positions.

2.5. Initialization of Levelmeter 2000

Outlines steps to initialize the Levelmeter 2000 before calibration.

2.6. Checking the calibration position

Methods to check robot axis calibration positions using TPU or FlexPendant.

Calibration

3.1. Introduction

Details the complete calibration procedure using the Levelmeter 2000.

3.2. Calibration, axis 1, IRB 140

Details mechanical calibration of axis 1 for IRB 140 using special equipment.

3.9. Calibration, axis 2

Details fine calibration of axis 2 using Levelmeter 2000.

3.14. Fine calibration procedure on TPU

How to perform fine calibration using the Teach Pendant Unit (TPU).

3.15. Fine calibration procedure on FlexPendant

How to perform fine calibration using the FlexPendant.

3.16. Resetting of Levelmeter 2000 and sensor

Details how to reset the Levelmeter 2000 and sensor before calibration.

3.17. Updating revolution counters

How to perform rough calibration by updating revolution counters.

After Calibration

4.1. Introduction

Details the final step to verify that the robot calibration is correct.

4.2. Post calibration procedure

Procedure to verify calibration positions and save parameters.

Related product manuals