EasyManua.ls Logo

ABB IRC5

ABB IRC5
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4. Connecting the READYpendant
The READYpendant includes these safety outputs:
1. Key Owitch (Robot peration Mode)
2. Three-Position Enabling Owitch
3. Emergency Otop Button
The end of the READYpendant cable includes:
1. ne RJ45 Ethernet cable for communication with the IPC.
2. 15 Flying leads—2 for power, 12 for safety I/, and 1 unused lead.

Other manuals for ABB IRC5

Related product manuals