MNS DTR / MNS Service
107
Konserwacja i części zamienne
Maintena
n
ce
and Spare Parts
General inspection of the switchgear assembly
(withdrawable or plug-in, disconnectable, raila-
ble technique)
Design of conductors and conductor installation
Measure the insulation
resistance
Check electrical equipment installed
Check contact corrosion, contact gaps, ionization chamber,
arc splitter, rated currents, settings and tripping
For the complete main-
tenance work, observe
the instructions of the
equipment manufactur-
er
Minimum creepage distance 12,5 mm
Check minimum clearance for arcing space
Cf. equipment manu-
facturer
Required protection class
Check efficiency of protective conductor connection
Check continuity with signal test apparatus
Function test of the control device
In accordance with circuit diagram
Control connection
cable.
In accordance with circuit diagram
Compact modules (8E/4 + 8E/2)
Check easy movement of module in compart-
ment
Remove dust and grease from guide rail if necessary
Function test of mechanical interlock
Lubricate with Omnigliss
Check electrical contact-making
In case of doubt check contact clearance
Visual inspection of module compartment
Remove dust from guide rail with vacuum cleaner
Actuate limit switch rocker (if available)
Check condition of mating contacts
Check efficiency of protective conductor con-
nection
Check cam condition at supporting rail
Withdrawable modules 4E
Check easy movement of module in compart-
ment
Function test of mechanical interlock
1
Main contact to be checked either according the mentioned time intervals or latest after 100 cycles.