Storing, lifting and transporting 25
Lifting the inverter in the shipping package
With a crane
• Lift the inverter in its shipping packaging. If you remove the packaging, protect the
inverter from scratches and dents.
• Make sure that the slings have sufficient loading capacity.
• The minimum length of each sling is 1.8 m.
• Adjust the lengths of the lifting slings to make sure that the inverter does not tilt.
• Attach a guide wire to a bottom corner of the inverter to prevent rotation.
Position each sling as
close to a transverse
board as possible.
We recommend the use
of transverse spreader
bars.
Lifting point