23. Ordering for pre-configured IED
Guidelines
Carefully read and follow the set of rules to ensure problem-free order management.
Please refer to the available functions table for included application functions.
PCM600 can be used to make changes and/or additions to the delivered factory configuration of the pre-configured.
To obtain the complete ordering code, please combine code from the tables, as given in the example below.
Example code: RED670 *2.1-A30X00- A02H02-B1A3-AC-MB-B-A3X0-DAB1RGN1N1XXXXXXX-AXFXXX-AX. Using the code of each position #1-13 specified as
RED670*1-2 2-3 3 3 3 3 3 3 3 3 3 3 3 3-4 4-5-6-7 8-9-10 10 10 10-110 11 11 11 11 11 11 11 11 11 11-12 12 12 12 12 12-13 13
# 1 - 2 - 3 - 4 - 5 6 - 7 - 8 - 9 -
RED670* - - - - - . - -
10 - 11 - 12 - 13
- . -
Position
SOFTWARE #1 Notes and Rules
Version number
Version no 2.1
Selection for position #1.
Configuration alternatives #2 Notes and Rules
Single breaker, 3 phase tripping A31
Multi breaker, 3 phase tripping B31
Single breaker, 1 phase tripping A32
Multi breaker, 1 phase tripping B32
ACT configuration
ABB standard configuration X00
Selection for position #2.
1MRK 505 346-BEN -
Line differential protection RED670 2.1 IEC
Product version: 2.1
126 ABB

Table of Contents

Other manuals for ABB RED670