EasyManua.ls Logo

ABB RED670 - Verifying Analog Primary and Secondary Measurement

ABB RED670
137 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 91. Three phase overcurrent LCP3PTOC
Function Range or value Accuracy
Operate value, overcurrent (5-2500)% of IBase ±1.0% of I
r
at I ≤ I
r
±1.0% of I at I > I
r
Reset ratio, overcurrent > 95% at (50-2500)% of IBase -
Start time at 0 to 2 x I
set
Min. = 10 ms
Max. = 25 ms
-
Reset time at 2 to 0 x I
set
Min. = 20 ms
Max. = 35 ms
-
Critical impulse time, overcurrent 5 ms typically at 0 to 2 x I
set
2 ms typically at 0 to 10 x I
set
-
Impulse margin time, overcurrent 10 ms typically -
Independent time delay to operate at 0 to 2 x I
set
(0.000-60.000) s ±0.2% or ±30 ms whichever is
greater
Table 92. Three phase undercurrent LCP3PTUC
Function
Range or value Accuracy
Operate value, undercurrent (1.00-100.00)% of IBase ±1.0% of I
r
Reset ratio, undercurrent < 105% at (50.00-100.00)% of IBase -
Start time at 2 to 0 x I
set
Min. = 15 ms
Max. = 30 ms
-
Reset time at 0 to 2 x I
set
Min. = 10 ms
Max. = 25 ms
-
Critical impulse time, undercurrent 10 ms typically at 2 to 0 x I
set
-
Impulse margin time, undercurrent 10 ms typically -
Independent time delay to operate at 2 to 0 x I
set
(0.000-60.000) s ±0.2% or ±45 ms whichever is
greater
1MRK 505 346-BEN -
Line differential protection RED670 2.1 IEC
Product version: 2.1
ABB 93

Table of Contents

Other manuals for ABB RED670

Related product manuals