EasyManua.ls Logo

ABB REF 542plus - Page 63

ABB REF 542plus
134 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
63
A051438 2
Fig. 16.1.-4 HMI is polling the Base unit addresses
Select the HMI <-> Base Unit address to change the address to be polled.
A051439 2
Fig. 16.1.-5 Changing the Base Unit address to be polled.
HMI Self Test
Only with the older version of the HMI V4, the HMI can be tested
without connection to the base unit. The test must be done by using the
foreseen menu item on the Power Up Operations. The HMI V5 must
only be tested in connection to the base unit and by using the related
test menu after reaching the ready status.
Press ENTER
to start the test for the HMI.
Multifunction Protection and Switchgear Control Unit
Operator's manual
REF 542plusREF 542plus
1MRS755869

Table of Contents

Other manuals for ABB REF 542plus

Related product manuals