15.2 Indications on operation
The SACE PR010/T unit can be used with all SACE PR123/P releases by connecting the test
unit to the protection unit with the cable provided, to be inserted in the test connector on the
front.
It is not necessary for the auxiliary supply to be present in order to use the above releases with
the PR010/T unit.
The automatic and manual tests must be performed with the circuit breaker off while the trip
test may be performed only with the circuit breaker on; in either case the circulating currents
must be null.
WARNING
For PR123/P releases with a software version prior to 1.0, the following
limitations must be considered:
A description of the various menus is given below.
15.3 Test
By means of the PR010/T unit it is possible to perform some tests on the protection unit, in
particular:
1. Automatic test
2. Manual test
3. Trip test
4. Sign. mod. autotest
5. Force output S ZS
6. Force output G ZS
NOTES
1
Only for performing LSIG and presence of residual current in the external toroide.
2
Only if measuring module present.
3
Only if communication module present.
4
Only if signalling module present.
5
Only for performing LSIG.
1. Startup time protection S:
0.1 s Time 1.5 s step 0.01 s
2. Startup time protection S2:
0.1 s Time 1.5 s step 0.01 s
3. Startup time protection G:
0.1 s Time 1.5 s step 0.01 s
4. Startup time protection Gext:
0.1 s Time 1.5 s step 0.01 s
5. Startup time protection D:
0.1 s Time 1.5 s step 0.01 s
6. Startup current activation threshold not contemplated
7. Protection U threshold: 5% th 90% step 5%
8. Minimum custom datalogger activation time not contemplated