A brief description of the various tests will be given below.
14.3.1 Automatic test of the release PR122/P
• In the absence of the PR120/V measuring module:
with the automatic test, a sequence of 7 different tests will be performed at the currents and phases
indicated in the following table:
• In the presence of the PR120/V measuring module:
with the automatic test, a sequence of 13 different tests will be performed at the currents, voltages,
phase shift and phases indicated in the following table:
For example test n° 5 is performed with:
IL = 0.3 In
Test N° Phase Value
L1 L2 L3
1
uuu
0.3 In
2
uuu
3.0 In
3
uuu
5.0 In
4
uuu
10.0 In
5
uuu
15.0 In
6
u
0.3 In
7
u
3.0 In
Test
N°
Phase Amplitude Phase shift
L1 L2 L3 V12 V23 V31 I [In] V[Un]
Φ
1
uu u u u u
3.0 1.0 30°
2
uu u u u u
5.0
3
uu u u u u
10
4
uu u u u u
15
5
uuuu
0.3 1.0 0°
6
uuuu
3.0
7
uu u u u u
0.3 1.0 210°
8
uu u u u u
3.0
9
uu u u u u
5.0
10
uu u u u u
10
11
uu u u u u
15
12
uu u
0.0 0.4 ---
13
uu u
1.3