Installation and Connection Sequence
WBPEEUI240751C0 5 - 3
Installation and Connection Sequence
NOTE: Always follow the instructions given in
Special Handling
in this section
when handling an I/O module.
Figures 5-1 through 5-6 comprise the I/O and auxiliary block
installation and connection flowchart. This flowchart applies
whether installing blocks in a new system or in an existing
system.
In the flowchart, each flowchart block represents a single task.
The PR code in the flowchart block identifies the procedure
section that describes the steps to complete the indicated task.
For example, turn to section PR4 to read about auxiliary block
installation. Some steps are self-explanatory and have no
related procedure section. Complete all steps given in a proce-
dure section before continuing to the next flowchart block. The
procedure sections are located towards the back of the
instruction.
PR12 DIO-400 setup
PR13 DOT-100 setup
PR14 DOT-120 setup
PR15 CIO-110 setup
PR16 RLY-200 setup
PR17 CIO-100/110 cable connection
PR18 RLY-100/200 cable connection
PR19 Field wiring (S type base)
PR20 Field wiring (C type base)
PR21 Field wiring (cable connection)
PR22 CIO-110 wiring
PR23 RLY-100/200 wiring
PR24 Offline diagnostics
PR25 Device label definition
PR26 I/O system configuration
Table 5-1. Installation Procedures
(continued)
Procedure Description

Table of Contents