EasyManua.ls Logo

ABB Symphony Harmony Series - Block

ABB Symphony Harmony Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WBPEEUI240751C0 PR15 - 1
PR15
CIO-110 Setup
Purpose/Scope
This procedure gives the steps required to set up the CIO-110
block for proper operation.
Parts
None.
To o l s
Small-tipped, flat-blade screwdriver.
Needlenose pliers (optional).
IISAC01 Analog Control Station instruction.
Procedure
1. Set the M/A power select jumpers J1 and J2 as appropri-
ate (Table PR15-1).
Refer to Figure PR15-1 for jumper locations. Refer to the
IISAC01 Analog Control Station
IISAC01 Analog Control StationIISAC01 Analog Control Station
IISAC01 Analog Control Station instruction for an explanation
of the M/A power.
2. Verify a 1.6 A, 250 V fuse is present in fuse holder XF3.
This fuse is required when using LFP power for M/A power.
3. Verify 4.0 A, 250 V fuses are present in fuse holders XF1
and XF2. These fuses are for the +24 VDC LFP power that
operates IISAC01 control stations connected at P2 and P4
respectively.
5 min.
Table PR15-1. M /A Power Select Jumpers
Power Source J1 J2
External M/A power source connected at
terminal block
LFP power used for M/A power; no external
M/A power source connected
123
456
123
456
123
456
123
456

Table of Contents

Other manuals for ABB Symphony Harmony Series

Related product manuals