Purpose/Scope
This procedure gives the steps required to set up the DOT-120
block for proper operation. This includes setting jumpers and
switches, and checking for fuses.
Prerequisites
Completed worksheet WS9.
Parts
None.
To o l s
Small-tipped, flat-blade screwdriver.
Needlenose pliers (optional).
Important Notice
Only wire field devices to the normally open relay contacts on a
redundant DOT block. Both the normally open and normally
closed relay contacts can be used on a nonredundant DOT
block.
Procedure
1. Set the special operations switch SW2 located on the back
of the I/O module to normal operation.
2. Determine the block field power and I/O channel require-
ments. Refer to the appropriate worksheet or any other system
documentation available.
3. Set the field power select jumpers J1 and J2 located on the
back of the I/O module as appropriate (Table PR14-1).