EasyManua.ls Logo

ABB Symphony Harmony Series - Page 274

ABB Symphony Harmony Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WBPEEUI240751C0 PR28 - 1
PR28
I/O Module Removal
Purpose/Scope
This procedure gives the steps required to remove an I/O mod-
ule from its base. The removal procedure is the same for all
I/O modules. An I/O module can be removed with power on.
NOTE: Always follow the instructions given in
Special Handling
in Section 5
when handling an I/O module.
Parts
None.
To o l s
Flat-blade or Phillips screwdriver.
Thin rod for reset button, preferably nonmetallic.
Safety Considerations
Procedure
1. Depress the stop/reset button once to halt block operation
if not already halted.
2. Loosen the captive front panel fastening screw
(Fig. PR28-1).
3. Grasp the I/O module by its handle and gently pull.
1 min.
WARNING
1. An I/O module should not be inserted or removed with power
applied when located in a class I, division 2 hazardous location
unless the area is known to b e nonhazardous.
CAUTION
1. For analog input channels, if the fused AI IFP/LFP option is
selected to power a 4 to 20 milliampere input, removing the I/O
module from the base in nonredundant applications will result
in a loss of power to all input current loops.
W1

Table of Contents

Other manuals for ABB Symphony Harmony Series

Related product manuals