EasyManua.ls Logo

ABB Symphony Harmony Series - Page 378

ABB Symphony Harmony Series
402 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WBPEEUI240751C0 PR6 - 1
PR6
AIN-120 Setup
Purpose/Scope
This procedure gives the steps required to set up the AIN-120
block for proper operation. This includes setting jumpers and
switches, and checking for fuses.
Prerequisites
Completed worksheet WS1.
Parts
None.
To o l s
Small-tipped, flat-blade screwdriver.
Needlenose pliers (optional).
Safety Considerations
Procedure
1. Set the special operations switch SW2 located on the back
of the I/O module to normal operation.
2. Determine the block field power and I/O channel require-
ments. Refer to the appropriate worksheet or any other system
documentation available.
3. Set the field power select jumpers J1 and J2 located on the
back of the I/O module (Table PR6-1).
15 min.
CAUTION
1. For analog input channels, if the fused AI IFP/LFP option is
selected to power a 4 to 20 milliampere input, removing the I/O
module from the base in nonredundant applications will result
in a loss of power to all input current loops.
87654321
ON
OFF
T00884A

Table of Contents

Other manuals for ABB Symphony Harmony Series

Related product manuals