WBPEEUI240751C0 PR7 - 1
PR7
AIN-200 Setup
Purpose/Scope
This procedure gives the steps required to set up the AIN-200
block for proper operation. This includes setting jumpers and
switches, and checking for fuses.
Prerequisites
Completed worksheet WS2.
Parts
None.
To o l s
Small-tipped, flat-blade screwdriver.
Needlenose pliers (optional).
Procedure
1. Set the special operations switch SW2 located on the back
of the I/O module to normal operation.
2. Determine the block field power and I/O channel require-
ments. Refer to the appropriate worksheet or any other system
documentation available.
3. Verify the field power select jumpers J1 and J2 located on
the back of the I/O module are set as shown in Table PR7-1.
4. Verify 1.6 A, 250 V fuses are present in both the A and B
channel block power fuse holders on the I/O module.
5. Verify a 3.15 A, 250 V fuse is present in the field power fuse
holder.
10 min.
87654321
ON
OFF
T00884A
Table PR7-1. Field Power Select Jumpers
Field Power J1 J2 Description
IFP Field power from mounting
column bus
123 123