Energizing the panel
1. Close Source 1 circuit breaker.
NOTE: The HMI should illuminate if line
voltage is present and S1 LED should
light up.
2. Verify the phase to phase voltages at
the Source 1 terminals.
3. Initiate auto configure from HMI default
screen: Main Menu > Parameters >
System Parameters > Start Automatic
Configuration and allow a few seconds
for system parameters to set"
4. Close the Source 2 circuit breaker.
5. Perform TEST function through HMI to
conform that engine start and all other
timer setting is working as intended
NOTE: If generator voltage is present at
Source 2 terminals, S2 LED should light
up.
6. Verify phase rotation of S1 matches
that of S2.
NOTE: The ATS will not allow transfer if
phase rotation does not match.
7. Shut down the generator engine.