EasyManua.ls Logo

ABB TPL65-A10 - Page 112

ABB TPL65-A10
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL65-A10 / -A30
10 Mothballing the turbocharger / 10.1 Taking the engine out of opera-
tion for up to 12months
© Copyright 2020 . All rights reserved. HZTL2482_EN Rev.E March 2020
If the total acid number (TAN) is greater than 2 mg KOH/g, the following
mothballing measures are necessary after taking an engine out of opera-
tion:
u Dismantle the turbocharger.
u The rotor and the bearing parts must be removed by an official ABB
Turbocharging service station and refitted afterwards.
u Clean all parts.
u Machined, bright surfaces of steel and cast parts must be oiled with
anticorrosive oil.
u Reassemble complete turbocharger.
Rotor turning in stack draught
If the rotor turns as a result of the stack draught:
u Install blind flange between compressor casing outlet flange and
charge air duct.
Page 110 / 117

Table of Contents

Related product manuals