EasyManua.ls Logo

ABB TPL65-A10 - Page 22

ABB TPL65-A10
120 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL65-A10 / -A30
2 Safety / 2.6 Safe operation and maintenance
© Copyright 2020 . All rights reserved. HZTL2482_EN Rev.E March 2020
Safety during disassembly, assembly, maintenance and
troubleshooting
u Always perform the specified adjustments, servicing as well as in-
spection work and observe inspection intervals.
u Inform operating personnel about all service and repair work before
beginning.
u Before opening a cover or removing a protective device on a tur-
bocharger, the engine must be switched off and the turbocharger
must have come to a standstill.
u Ensure that the supply of oil is interrupted, especially with an external
oil supply.
u Put the engine into operation only after all parts have been refitted
properly.
CAUTION
Mechanical work on the turbocharger
Possible damage to or destruction of components on the turbocharger.
u Perform only those tasks that are described in this manual.
u Perform work only for which training has been carried out.
Safety when taking out of operation or preparing for mothballing
u Secure the rotor so it cannot turn. The rotor can turn on its own from
the force of the stack draught.
u Clean the turbocharger before mothballing it.
u Observe the material safety data sheet for the cleaning and moth-
balling agents.
u Wear personal protective equipment (PPE) according to the material
safety data sheet.
Page 20 / 117

Table of Contents

Related product manuals