EasyManua.ls Logo

ABB TPL77-A32 - Page 111

ABB TPL77-A32
137 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
© Copyright 2020 . All rights reserved. HZTL2481_EN Rev.D March 2020
Flange connection assembly
u Carefully clean slots and contact surfaces of the casings and keep
them free of metal chips.
u Keep slots and spiral-wound gasket free of oil and grease.
1) If present
u Fix a new spiral-wound gasket(61050) in the slot using a little super-
glue (for example "Loctite®454gel") applied at three evenly distrib-
uted points.
TPL73 – TPL77
u Fit the nozzle ring. Place the holder (90175) over the nozzle ring, then
tighten holder (90175) using screw (61044) and Verbus Ripp® washer
(61043).
u Align gas inlet casing and secure using hexagon nuts (90178) on studs
(90177).
TPL69
u Insert and position nozzle ring.
TPL73 – TPL77
u Remove holder (90175) and screw (61044) together with Verbus Ripp®
washers (61043).
u Coat thread of screws (61044) with high-temperature grease.
u Fit the gas inlet casing flange hand-tight to the gas outlet casing us-
ing screws (61044) and Verbus Ripp® washers (61043).
u Remove the hexagon nuts (90178) from the studs (90177).
u Replace the studs (90177) with hexagon-head screws (61044) and Ver-
bus Ripp® washers (61043).
Page 109 / 134

Table of Contents

Related product manuals