EasyManua.ls Logo

ABB TPL77-A32 - Page 112

ABB TPL77-A32
137 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPL69-A10 / -A30 ... TPL77-A10 / -A30
8 Disassembly and assembly / 8.8 Dismantling and fitting nozzle ring
at turbine end
© Copyright 2020 . All rights reserved. HZTL2481_EN Rev.D March 2020
Segment connection assembly
u Carefully clean slots and contact surfaces of the casings and keep
them free of metal chips.
u Keep slots and spiral-wound gasket free of oil and grease.
In the case of the gas inlet casing with segments, the segments are posi-
tioned with the aid of recesses and cams on the casing.
u Coat the screw threads with high-temperature grease.
1) If present
u Fix a new spiral-wound gasket(61050) in the slot using a little super-
glue (for example "Loctite®454gel") applied at three evenly distrib-
uted points.
u Position gas inlet casing complete with nozzle ring on gas outlet cas-
ing (61001).
u Remove the two studs (90177) in the lower area.
u Attach the segment (51012) with the recess on the cam on the gas in-
let casing and fit it loosely using screws (61044).
u Put remaining segments (51012) in place on gas inlet casing (51001)
and fit them loosely using screws (61044).
Check
u Collar (C) of segments (51012) must be in slot (S).
Page 110 / 134

Table of Contents

Related product manuals