EasyManua.ls Logo

ABB TPS 48D01 - Page 39

ABB TPS 48D01
130 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation Manual / TPS48-D/E.. - TPS61-D/E..
Commissioning
3
Oil supply
3.1
Page 37
April 2015 HZTL2410_EN Revision D
The oil pressure in front of the turbocharger must be maintained precisely
to ensure trouble-free operation.
Status for operation
Oil pressure in front of
turbocharger
[bar]
Normal operation 2.04.5
Engine start: cold oil, permissible for maximum
15 minutes
8.0
Engine idling 0.2
Pre- and post-lubrication (engine stopped) 1.0
CAUTION
Prelubrication
Serious machine or property damage might result if the turbocharger is
not supplied with oil when the engine is starting.
Activate prelubrication device before starting engine.
© Copyright 2015 ABB. All rights reserved.

Table of Contents

Related product manuals