- 71 -
000723AG
5 - Installation
Closing the front cover
At the end of the inverter connection and conguration stage and before
proceeding with the commissioning, the inverter's covers
04
and the wir-
ing box covers
05
must be closed.
During the installation of the cover, the installation sequence must be respected as well as
the tightening torque of the screws (set out in the paragraph on technical data) in order to
maintain NEMA Type 4X enclosure integrity.
• Insert and screw in the xing screws.
Tighten the screws respecting the sequence and the tightening torque
(2.5 Nm / 1.8 ft-lb).
1b
04
05
1a
3a
4a
2a
7b
8b
6b
5b
4b
3b
2b
After having installed the front cover, it is possible to proceed with the
commissioning of the inverter.