EasyManua.ls Logo

ABB WaterMaster FET100 - Cable Preparation (Remote Systems Only)

ABB WaterMaster FET100
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WaterMaster FET100
Electromagnetic floweter | Transmitter 3 Electrical Installation
OI/FET100–EN Rev. A 11
3.3 Cable Preparation (Remote Systems Only)
To prepare the cable for connection at the transmitter and sensor terminal blocks:
1. Remove the outer cable insulation and Mylar
®
wrap.
2. Ensure the drain wire is sleeved.
3. Cut the cable connection wires to the lengths shown in Fig 3.5, page 12.
Fig. 3.4 Cable Gland / Conduit Entry (Remote Transmitter Shown)
AC/DC Power
Supply Terminal
Power Cable Output Connections
External Earth
Output Connections
Sensor Cable
Output
Connections
Termi n a l
Sensor
Cable Terminal
Backplane
Internal Earth
(Alternative PE)
Internal Earth
(Alternative PE)
Te s t P o in t s f o r
Output Connections

Related product manuals