EasyManua.ls Logo

Acer X1130P - Module Assembly Key Point - Optical Engine

Acer X1130P
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41
Module Assembly Key Point - Optical Engine
1. Light Pipe Module assembly and overfill alignment
1.1 Assembly LP Module to HSG DMD
(1) Assembly two Overfill adjustment screws to HSG DMD (Fig. 1-1).
** Adjustment criteria refer to below item
(2) Assembly “Clip LP” and lock with screw well (Fig. 1-2).
(3) Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig. 1-3).
(4) Placed LP Module on LP datum of “DMD HSG” and adjustment screw well (Fig.1-4).
(5) Assembly “Baffle LP” first (Fig. 1-5-1) & push “Baffle LP” to hook DMD HSG, and then
lock with screw well (Fig. 1-5-2).
1.2 Overfill Adjustment @ LP Module
Overfill Adjustment Criteria:
(1) Pre-assembly 2 adjusting screws. Criteria shown as Fig.1-6.
(2) Alignment Sequence:
a. To adjust “Horizontal Adjustment Screw” firstly, and then “Vertical Adjustment
Screw”.
b. Refer to Fig. 1-6.
(3) For Overfill Re-adjustment:
a. Those 2 Adjustment Screws must be released closely to the “Pre-assembly”
positions first.
b. Follow adjustment steps shown in Item 1.2.
Fig. 1-1 Fig. 1-2
Overfill Vertical
Adjustment Screw
Overfill Horizontal
Adjustment S
crew
Clip LP

Related product manuals