EasyManua.ls Logo

Acer X1130P - Page 44

Acer X1130P
109 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
2. Assembly FM Module:
Place FM on “HLD FM” surface(Fig. 2-1) and use “Clip FM” to fix FM(Fig. 2-2).
Fig. 2-1 Fig. 2-2
3. Assembly HSG ILL Module:
3.1 CM Assembly
I. Insert “Clip CM Side” first, and then place “Clip Front CM” to fixed-shaft of ILL SUB
before locking screw (Fig. 3-1, Fig. 3-2).
II. Assemble CM to HSG ILL and to make CM contact three datum on the HSG ILL
Well (Fig. 3-3).
III. Assemble “CLIP TOP CM” (with forceps) to the “HSG IL” (Fig. 3-4,).
IV. To check and make sure “CLIP of CM” hooks the HSG ILL very Well (Fig. 3-5).
V. Paste “Sponge tube AL” on cannelure of” HSG ILL” (Fig. 3-6).
6.2 FM Module Assembly
1. FM Module must be placed to fixed shaft and on the datum surface of “ILL SUB”
and then lock with screw well (Fig. 3-7).
Fig. 3-1 Fig. 3-2
Screw
Clip CM Side
Fixed shafts
of ILL SUB
Touch the
side surface
Clip FM hook
the punch
points

Related product manuals