SUGGESTED MAINTENANCE
10.1. SUGGESTED MAINTENANCE
In order to guarantee safety of the radiographic system, it is necessary to set up a maintenance schedule.
The RESPONSIBLE ORGANISATION is responsible for planning and observing a maintenance schedule which
must be executed by qualied technicians who must be able to certify their work with a “Conformity Declaration”.
CAUTION
Run an inspection on the radiographic system and on its operation when it is installed and every twelve months.
Once a year, lubricate the pins and bushes of the wall plate and the positioning arm, as specied in the
INSTALLATION & MAINTENANCE MANUAL.
WARNING
Do not lose the adjustment key that comes with the system, since, in time, it could become
necessary to make readjustments.
WARNING
If the parts should become hard to move or should squeak, call the “Assistance Service”.
10.2. CLEANING THE OUTER SURFACES
Clean the external surface using a damp cloth and non-corrosive non oil-based detergent and disinfect it using a
non-aggressive medical detergent.
Do not spray detergent or disinfectant directly on the device.
The spacer cone may be cleaned with cotton wool soaked with surgical alcohol.
CAUTION
• Turn off and disconnect the device from the supply mains before carrying out cleaning operations.
• Do not spray products directly on the device. Apply the product on a clean cloth.
• Always use disposable protective covers for the applied parts.
• Do not use UV systems to disinfect the equipment, as exposed parts of the device can turn yellow or discolour.
• To avoid any potential hazard or danger to operators and patients, contact your authorized Acteon Technical Representative immediately if you
experience any unusual operation, mechanical issues, or equipment malfunction.