EasyManua.ls Logo

AEG AC2000 N1 - 5 Preparing the Product for Use; Safety Measures before Use; Unpacking

AEG AC2000 N1
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Switch-mode power supply AC2000 N1 / DC2000 N1 / AC3000 N1 / DC3000 N1 - Operating instructions
80001533 EFE en Page 24 of 41
5 PREPARING THE PRODUCT FOR USE
5.1 Safety measures before use
Before connecting to the mains, check that the mains voltage
information on the rating plate corresponds to the existing mains
voltage. The mains connection X1 is made via a
3-pole plug-in terminal (L(+), N(-), PE) on the front of the device. The
direct current (DC) connection X2 and the additional protective
conductor connection of the device are made via connection bolts
behind the cover on the right-hand side of the front of the device.
5. 2 Unpacking
Observe the following instructions:
Only remove the molded parts and stretch film immediately before
installing them in the system. This prevents unnecessary damage
to the system.
Remove any condensation that has formed inside and outside the
system. Condensation is caused by pressure and temperature
fluctuations between the place of manufacture and installation of
the system.
i
The condensation evaporates within 48 hours when the system
is stored at the installation site.
Save the stretch film and the transport pallet if it is foreseeable that
the system will be stored.
The stretch film and the polyethylene foam molded parts are
chemically inert and can be disposed of with normal
industrial waste or recycled.

Table of Contents