EasyManua.ls Logo

AEG AC2000 N1 - Maintenance Schedule; Qualified AEG PS Service

AEG AC2000 N1
41 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Switch-mode power supply AC2000 N1 / DC2000 N1 / AC3000 N1 / DC3000 N1 - Operating instructions
80001533 EFE en Page 39 of 41
7.4 Maintenance schedule
Compliance with the maintenance schedule is necessary to maintain
availability.
Period Activity
Every 12
months
Visual inspection and cleaning of the appliance if
necessary.
A functional test is recommended. Optionally, a
diagnostic device can be used for particularly
critical applications.
Every 8 years
Replacement of the electrolytic capacitors, to be
carried out by AEG PS.
Every 8 years Calibration check to be carried out by AEG PS.
7.5 Qualified AEG PS Service
 Power Solutions GmbH
Emil-Siepmann-Strasse 32
59581 Warstein
Germany
+49 2902 763 100
Fax: +49 2902 763 645
E-Mail: service.aegps@aegps.com
Internet: http://www.aegps.com

Table of Contents