EasyManua.ls Logo

AERMEC ANK045 H - 24. ELECTRIC CONNECTIONS; 24.2. ELECTRIC POWER CONNECTION TO THE ELECTRICAL MAINS

AERMEC ANK045 H
48 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EN
11_11. 6755532_02
๎งฐ๎งญ
๎งฎ๎งฐ๎ฅ˜๎˜ƒ ๎˜œ๎˜พ๎˜œ๎˜’๎™ค๎™š๎˜ฏ๎˜’๎˜ƒ๎˜’๎™‹๎™…๎™…๎˜œ๎˜’๎™ค๎˜ฏ๎™‹๎™…๎™ž
The ANK heat pumps are completely wired at the
๎œจ๎œ‚๎œ๎žš๎ฝ๎žŒ๎Ÿ‡๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎ฝ๎ถ๎ฏ๎Ÿ‡๎˜ƒ๎žŒ๎œž๎ž‹๎žต๎๎žŒ๎œž๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎žš๎ฝ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œž๎ฏ๎œž๎œ๎žš๎žŒ๎-
cal mains, downstream from a unit switch, accord-
ing to that envisioned by the Standards in force on
this subject in the country of installation.
It s also advised to check that:
๎จพ the electrical mains features are suitable
๎œจ๎ฝ๎žŒ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ‚๎œ๎ž๎ฝ๎žŒ๎ž‰๎žŸ๎ฝ๎ถ๎˜ƒ๎Ÿ€๎œ‚๎ฏ๎žต๎œž๎ž๎˜ƒ๎๎ถ๎œš๎๎œ๎œ‚๎žš๎œž๎œš๎˜ƒ๎๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ
electrical data table, TAB. also taking into
๎œ๎ฝ๎ถ๎ž๎๎œš๎œž๎žŒ๎œ‚๎žŸ๎ฝ๎ถ๎˜ƒ๎œ‚๎ถ๎Ÿ‡๎˜ƒ๎ฝ๎žš๎š๎œž๎žŒ๎˜ƒ๎ต๎œ‚๎œ๎š๎๎ถ๎œž๎ž๎˜ƒ๎ฝ๎ž‰๎œž๎žŒ๎œ‚๎žš-
๎๎ถ๎๎˜ƒ๎œ‚๎žš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎ž๎œ‚๎ต๎œž๎˜ƒ๎žŸ๎ต๎œž๎ฅ˜
๎จพ The unit is only powered when installa-
๎žŸ๎ฝ๎ถ๎˜ƒ๎š๎œ‚๎ž๎˜ƒ๎œ๎œž๎œž๎ถ๎˜ƒ๎œ๎ฝ๎ต๎ž‰๎ฏ๎œž๎žš๎œž๎œš๎˜ƒ๎ฅพ๎š๎Ÿ‡๎œš๎žŒ๎œ‚๎žต๎ฏ๎๎œ๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ
๎œž๎ฏ๎œž๎œ๎žš๎žŒ๎๎œ๎ฅฟ๎ฅ˜
๎จพ๎˜ƒ ๎™š๎œž๎ž๎ž‰๎œž๎œ๎žš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎๎ถ๎œš๎๎œ๎œ‚๎žŸ๎ฝ๎ถ๎ž๎˜ƒ๎ฝ๎œจ๎˜ƒ๎žš๎š๎œž๎˜ƒ
phase, and earth wires.
๎จพ The power supply line must have a
๎žŒ๎œž๎ฏ๎œž๎Ÿ€๎œ‚๎ถ๎žš๎˜ƒ๎ž‰๎žŒ๎ฝ๎žš๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎ต๎ฝ๎žต๎ถ๎žš๎œž๎œš๎˜ƒ๎žต๎ž‰๎ž๎žš๎žŒ๎œž๎œ‚๎ต๎˜ƒ
against short circuits and dispersions to
earth, which isolates the system with
๎žŒ๎œž๎ž๎ž‰๎œž๎œ๎žš๎˜ƒ๎žš๎ฝ๎˜ƒ๎ฝ๎žš๎š๎œž๎žŒ๎˜ƒ๎žต๎žŸ๎ฏ๎๎žŸ๎œž๎ž๎ฅ˜
๎จพ The voltage must be within a tolerance
of ยฑ10% of the nominal power supply
voltage of the machine (for unbalanced
three-phase unit max 3% between the
๎ž‰๎š๎œ‚๎ž๎œž๎ž๎ฅฟ๎ฅ˜๎˜ƒ๎™ด๎š๎œž๎ถ๎œž๎Ÿ€๎œž๎žŒ๎˜ƒ๎žš๎š๎œž๎ž๎œž๎˜ƒ๎ž‰๎œ‚๎žŒ๎œ‚๎ต๎œž๎žš๎œž๎žŒ๎ž๎˜ƒ๎œ‚๎žŒ๎œž๎˜ƒ
not respected, contact the electric energy
๎ž‰๎žต๎œ๎ฏ๎๎œ๎˜ƒ๎œ๎ฝ๎œš๎Ÿ‡๎ฅ˜๎˜ƒ ๎˜ฆ๎ฝ๎žŒ๎˜ƒ๎œž๎ฏ๎œž๎œ๎žš๎žŒ๎๎œ๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎ž๎ฅ•๎˜ƒ
๎žต๎ž๎œž๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ๎œ‚๎œ๎ฏ๎œž๎ž๎˜ƒ๎Ÿ๎๎žš๎š๎˜ƒ๎œš๎ฝ๎žต๎œ๎ฏ๎œž๎˜ƒ๎๎ž๎ฝ๎ฏ๎œ‚๎žŸ๎ฝ๎ถ๎˜ƒ๎œ‚๎œ-
cording to the Standards in force on this
๎ž๎žต๎œ๎ฉ๎œž๎œ๎žš๎˜ƒ๎๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œš๎๎œซ๎œž๎žŒ๎œž๎ถ๎žš๎˜ƒ๎œ๎ฝ๎žต๎ถ๎žš๎žŒ๎๎œž๎ž๎ฅ˜
๎จพ The use of an omnipolar magnet circuit
breaker switch is mandatory, in compli-
ance with the IEC-EN Standards (contact
๎ฝ๎ž‰๎œž๎ถ๎๎ถ๎๎˜ƒ๎œ‚๎žš๎˜ƒ๎ฏ๎œž๎œ‚๎ž๎žš๎˜ƒ๎งฏ๎˜ƒ๎ต๎ต๎ฅฟ๎ฅ•๎˜ƒ๎Ÿ๎๎žš๎š๎˜ƒ๎ž๎žต๎๎žš๎œ‚๎œ๎ฏ๎œž๎˜ƒ๎œ๎žต๎žš๎ฅฒ
๎ฝ๎œซ๎˜ƒ๎ž‰๎ฝ๎Ÿ๎œž๎žŒ๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎œš๎๎œซ๎œž๎žŒ๎œž๎ถ๎žŸ๎œ‚๎ฏ๎˜ƒ๎ž‰๎žŒ๎ฝ๎žš๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎ฝ๎ถ๎˜ƒ
the basis of the electric data table shown
below, installed as near as possible to the
appliance.
๎จพ๎˜ƒ ๎˜ฏ๎žš๎˜ƒ๎๎ž๎˜ƒ๎ต๎œ‚๎ถ๎œš๎œ‚๎žš๎ฝ๎žŒ๎Ÿ‡๎˜ƒ๎žš๎ฝ๎˜ƒ๎ต๎œ‚๎ฌ๎œž๎˜ƒ๎œ‚๎ถ๎˜ƒ๎œž๎œซ๎œž๎œ๎žŸ๎Ÿ€๎œž๎˜ƒ๎œž๎œ‚๎žŒ๎žš๎š๎˜ƒ
๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎ฅ˜๎˜ƒ๎™ค๎š๎œž๎˜ƒ๎ต๎œ‚๎ถ๎žต๎œจ๎œ‚๎œ๎žš๎žต๎žŒ๎œž๎žŒ๎˜ƒ๎œ๎œ‚๎ถ๎ถ๎ฝ๎žš๎˜ƒ๎œ๎œž๎˜ƒ
considered responsible for any damage
๎œ๎œ‚๎žต๎ž๎œž๎œš๎˜ƒ๎œ๎Ÿ‡๎˜ƒ๎žš๎š๎œž๎˜ƒ๎ฏ๎œ‚๎œ๎ฌ๎˜ƒ๎ฝ๎œจ๎˜ƒ๎ฝ๎žŒ๎˜ƒ๎๎ถ๎œž๎œซ๎œž๎œ๎žŸ๎Ÿ€๎œž๎˜ƒ๎œ‚๎ž‰๎ž‰๎ฏ๎-
๎œ‚๎ถ๎œ๎œž๎˜ƒ๎œž๎œ‚๎žŒ๎žš๎š๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎ฅ˜
๎จพ For units with three-phase power sup-
๎ž‰๎ฏ๎Ÿ‡๎ฅ•๎˜ƒ๎œ๎š๎œž๎œ๎ฌ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ๎ฝ๎žŒ๎žŒ๎œž๎œ๎žš๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎ฝ๎œจ๎˜ƒ๎žš๎š๎œž๎˜ƒ
phases.
๎™ด๎˜„๎™š๎™…๎˜ฏ๎™…๎˜ง๎ฅ—
๎˜ฏ๎žš๎˜ƒ๎๎ž๎˜ƒ๎ž‰๎žŒ๎ฝ๎š๎๎œ๎๎žš๎œž๎œš๎˜ƒ๎žš๎ฝ๎˜ƒ๎žต๎ž๎œž๎˜ƒ๎žš๎š๎œž๎˜ƒ๎Ÿ๎œ‚๎žš๎œž๎žŒ๎˜ƒ๎ž‰๎๎ž‰๎œž๎ž๎˜ƒ๎žš๎ฝ๎˜ƒ๎œž๎œ‚๎žŒ๎žš๎š๎˜ƒ๎žš๎š๎œž๎˜ƒ
๎œ‚๎ž‰๎ž‰๎ฏ๎๎œ‚๎ถ๎œ๎œž๎ฅ˜
๎งฎ๎งฐ๎ฅ˜๎งญ๎ฅ˜๎˜ƒ ๎™š๎˜œ๎˜’๎™‹๎™„๎™„๎˜œ๎™…๎˜˜๎˜œ๎˜˜๎˜ƒ๎˜œ๎˜พ๎˜œ๎˜’๎™ค๎™š๎˜ฏ๎˜’๎˜ƒ
๎˜’๎˜„๎˜‘๎˜พ๎˜œ๎˜ƒ๎™ž๎˜œ๎˜’๎™ค๎˜ฏ๎™‹๎™…
๎™ค๎š๎œž๎˜ƒ๎œ๎œ‚๎œ๎ฏ๎œž๎˜ƒ๎ž๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎ž๎š๎ฝ๎Ÿ๎ถ๎˜ƒ๎๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎žš๎œ‚๎œ๎ฏ๎œž๎˜ƒ๎œ‚๎žŒ๎œž๎˜ƒ๎žŒ๎œž๎œ๎ฝ๎ต-
mended for maximum lengths of 50m.
๎˜ฆ๎ฝ๎žŒ๎˜ƒ๎ฏ๎ฝ๎ถ๎๎œž๎žŒ๎˜ƒ๎ฏ๎œž๎ถ๎๎žš๎š๎ž๎˜ƒ๎ฝ๎žŒ๎˜ƒ๎œš๎๎œซ๎œž๎žŒ๎œž๎ถ๎žš๎˜ƒ๎œ๎œ‚๎œ๎ฏ๎œž๎˜ƒ๎ฏ๎œ‚๎Ÿ‡๎๎ถ๎๎ฅ•๎˜ƒ๎๎žš๎˜ƒ๎๎ž๎˜ƒ
up to the PLANNER to calculate the appropriate
line switch, the power supply line as well as the
๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎žš๎ฝ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œž๎œ‚๎žŒ๎žš๎š๎˜ƒ๎Ÿ๎๎žŒ๎œž๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎œ๎œ‚๎œ๎ฏ๎œž๎ž๎˜ƒ
depending on:
๎จพ the length
๎จพ the type of cable
๎จพ๎˜ƒ ๎™ค๎š๎œž๎˜ƒ๎œ‚๎œ๎ž๎ฝ๎žŒ๎ž‰๎žŸ๎ฝ๎ถ๎˜ƒ๎ฝ๎œจ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎žต๎ถ๎๎žš๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎ž‰๎š๎Ÿ‡๎ž๎-
๎œ๎œ‚๎ฏ๎˜ƒ๎ฏ๎ฝ๎œ๎œ‚๎žŸ๎ฝ๎ถ๎ฅ•๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ‚๎ต๎œ๎๎œž๎ถ๎žš๎˜ƒ๎žš๎œž๎ต๎ž‰๎œž๎žŒ๎œ‚-
ture.
๎˜„๎™ค๎™ค๎˜œ๎™…๎™ค๎˜ฏ๎™‹๎™…:
๎˜’๎š๎œž๎œ๎ฌ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎žŸ๎๎š๎žš๎œž๎ถ๎๎ถ๎๎˜ƒ๎ฝ๎œจ๎˜ƒ๎œ‚๎ฏ๎ฏ๎˜ƒ๎ž‰๎ฝ๎Ÿ๎œž๎žŒ๎˜ƒ๎Ÿ๎๎žŒ๎œž๎˜ƒ๎œ๎ฏ๎œ‚๎ต๎ž‰๎ž๎˜ƒ๎ฝ๎ถ๎˜ƒ
๎œ๎ฝ๎ต๎ต๎๎ž๎ž๎๎ฝ๎ถ๎๎ถ๎๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎œ‚๎Œ๎œž๎žŒ๎˜ƒ๎งฏ๎งฌ๎˜ƒ๎œš๎œ‚๎Ÿ‡๎ž๎˜ƒ๎œจ๎žŒ๎ฝ๎ต๎˜ƒ๎ž๎žš๎œ‚๎žŒ๎žš๎ฅฒ๎žต๎ž‰๎ฅ˜๎˜ƒ
๎™ž๎žต๎œ๎ž๎œž๎ž‹๎žต๎œž๎ถ๎žš๎ฏ๎Ÿ‡๎ฅ•๎˜ƒ๎œ๎š๎œž๎œ๎ฌ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎žŸ๎๎š๎žš๎œž๎ถ๎๎ถ๎๎˜ƒ๎ฝ๎œจ๎˜ƒ๎œ‚๎ฏ๎ฏ๎˜ƒ๎žš๎š๎œž๎˜ƒ
๎ž‰๎ฝ๎Ÿ๎œž๎žŒ๎˜ƒ๎œ๎ฏ๎œ‚๎ต๎ž‰๎ž๎˜ƒ๎œž๎Ÿ€๎œž๎žŒ๎Ÿ‡๎˜ƒ๎ž๎๎Ÿ†๎˜ƒ๎ต๎ฝ๎ถ๎žš๎š๎ž๎ฅ˜
๎˜พ๎ฝ๎ฝ๎ž๎œž๎˜ƒ๎žš๎œž๎žŒ๎ต๎๎ถ๎œ‚๎ฏ๎ž๎˜ƒ๎œ๎œ‚๎ถ๎˜ƒ๎œ๎œ‚๎žต๎ž๎œž๎˜ƒ๎ฝ๎Ÿ€๎œž๎žŒ๎š๎œž๎œ‚๎žŸ๎ถ๎๎˜ƒ๎ฝ๎œจ๎˜ƒ๎žš๎š๎œž๎˜ƒ
๎œ๎œ‚๎œ๎ฏ๎œž๎ž๎˜ƒ๎œ‚๎ถ๎œš๎˜ƒ๎œ๎ฝ๎ต๎ž‰๎ฝ๎ถ๎œž๎ถ๎žš๎ž๎ฅ˜
๎งฎ๎งฐ๎ฅ˜๎งฎ๎ฅ˜๎˜ƒ ๎˜œ๎˜พ๎˜œ๎˜’๎™ค๎™š๎˜ฏ๎˜’๎˜ƒ๎™—๎™‹๎™ด๎˜œ๎™š๎˜ƒ๎˜’๎™‹๎™…๎™…๎˜œ๎˜’๎™ค๎˜ฏ๎™‹๎™…๎˜ƒ๎™ค๎™‹๎˜ƒ
๎™ค๎˜ฌ๎˜œ๎˜ƒ๎˜œ๎˜พ๎˜œ๎˜’๎™ค๎™š๎˜ฏ๎˜’๎˜„๎˜พ๎˜ƒ๎™„๎˜„๎˜ฏ๎™…๎™ž
1. ๎˜‘๎œž๎œจ๎ฝ๎žŒ๎œž๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ถ๎๎˜ƒ๎žš๎š๎œž๎˜ƒ๎žต๎ถ๎๎žš๎˜ƒ๎žš๎ฝ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎ž‰๎ฝ๎Ÿ๎œž๎žŒ๎˜ƒ๎ž๎žต๎ž‰-
๎ž‰๎ฏ๎Ÿ‡๎˜ƒ๎ต๎œ‚๎๎ถ๎ž๎˜ƒ๎ฅ•๎˜ƒ๎œž๎ถ๎ž๎žต๎žŒ๎œž๎˜ƒ๎žš๎š๎œ‚๎žš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎๎ž๎ฝ๎ฏ๎œ‚๎žŸ๎ถ๎๎˜ƒ๎ž๎Ÿ๎๎žš๎œ๎š๎˜ƒ
is open.
2. Open the front panel
3. ๎™จ๎ž๎œž๎˜ƒ๎žš๎š๎œž๎˜ƒ๎š๎ฝ๎ฏ๎œž๎ž๎˜ƒ๎œ‚๎žš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ๎ฝ๎žฉ๎ฝ๎ต๎˜ƒ๎ฝ๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œจ๎žŒ๎œ‚๎ต๎œž-
work for the main electric power supply
cable and for the cables of the other external
๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎ž๎˜ƒ๎žต๎ถ๎œš๎œž๎žŒ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎žŒ๎œž๎ž๎ž‰๎ฝ๎ถ๎ž๎๎œ๎๎ฏ๎๎žš๎Ÿ‡๎˜ƒ๎ฝ๎œจ๎˜ƒ๎žš๎š๎œž๎˜ƒ
installer.
4. It is forbidden to access with
๎œž๎ฏ๎œž๎œ๎žš๎žŒ๎๎œ๎˜ƒ๎œ๎œ‚๎œ๎ฏ๎œž๎ž๎˜ƒ๎๎ถ๎˜ƒ๎ž‰๎ฝ๎ž๎๎žŸ๎ฝ๎ถ๎ž๎˜ƒ๎ถ๎ฝ๎žš๎˜ƒ
๎ž๎ž‰๎œž๎œ๎๎œฎ๎œ๎œ‚๎ฏ๎ฏ๎Ÿ‡๎˜ƒ๎œž๎ถ๎Ÿ€๎๎ž๎๎ฝ๎ถ๎œž๎œš๎˜ƒ๎๎ถ๎˜ƒ๎žš๎š๎๎ž๎˜ƒ
manual.
5. Avoid direct contact with not
insulated copper piping and with
compressor.
6. ๎˜ฏ๎œš๎œž๎ถ๎žŸ๎œจ๎Ÿ‡๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ๎ฏ๎œ‚๎ต๎ž‰๎ž๎˜ƒ๎œจ๎ฝ๎žŒ๎˜ƒ๎žš๎š๎œž๎˜ƒ
๎œž๎ฏ๎œž๎œ๎žš๎žŒ๎๎œ๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎ฅ•๎˜ƒ๎œ‚๎ฏ๎Ÿ๎œ‚๎Ÿ‡๎ž๎˜ƒ๎žŒ๎œž๎œจ๎œž๎žŒ๎˜ƒ
to the electric layout supplied
with the unit.
7. ๎˜ƒ๎˜ฆ๎ฝ๎žŒ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œจ๎žต๎ถ๎œ๎žŸ๎ฝ๎ถ๎œ‚๎ฏ๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ
of the unit bring a power supply
cable to the electric control
board inside the unit and con-
nect to the U-N and PE clamps
๎žŒ๎œž๎ž๎ž‰๎œž๎œ๎žŸ๎ถ๎๎˜ƒ๎ฅพ๎™จ๎ฅฟ๎˜ƒ๎ž‰๎š๎œ‚๎ž๎œž๎ฅ•๎˜ƒ๎ฅพ๎™…๎ฅฟ๎˜ƒ๎ถ๎œž๎žต๎žš๎žŒ๎œ‚๎ฏ๎ฅ•๎˜ƒ
๎ฅพ๎™—๎˜œ๎ฅฟ๎˜ƒ๎œž๎œ‚๎žŒ๎žš๎š๎˜ƒ๎๎ถ๎˜ƒ๎œ๎œ‚๎ž๎œž๎˜ƒ๎ฝ๎œจ๎˜ƒ๎ž๎๎ถ๎๎ฏ๎œž๎ฅฒ๎ž‰๎š๎œ‚๎ž๎œž๎˜ƒ
๎ž‰๎ฝ๎Ÿ๎œž๎žŒ๎˜ƒ๎ž๎žต๎ž‰๎ž‰๎ฏ๎Ÿ‡๎˜ƒ๎ฅพ๎งฎ๎งฎ๎งฌ๎™ณ๎ฅฒ๎งญ๎ฆ•๎งฒ๎งฌ๎˜ฌ๎ŸŒ๎ฅฟ๎ฅ•๎˜ƒ
8. ๎™š๎œž๎ฅฒ๎ž‰๎ฝ๎ž๎๎žŸ๎ฝ๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎๎ถ๎ž๎ž‰๎œž๎œ๎žŸ๎ฝ๎ถ๎˜ƒ๎ž‰๎œ‚๎ถ๎œž๎ฏ๎ž๎˜ƒ
9. ๎˜œ๎ถ๎ž๎žต๎žŒ๎œž๎˜ƒ๎žš๎š๎œ‚๎žš๎˜ƒ๎œ‚๎ฏ๎ฏ๎˜ƒ๎ž‰๎žŒ๎ฝ๎žš๎œž๎œ๎žŸ๎ฝ๎ถ๎ž๎˜ƒ
removed for the electric connec-
๎žŸ๎ฝ๎ถ๎˜ƒ๎š๎œ‚๎Ÿ€๎œž๎˜ƒ๎œ๎œž๎œž๎ถ๎˜ƒ๎žŒ๎œž๎ž๎žš๎ฝ๎žŒ๎œž๎œš๎˜ƒ๎œ๎œž๎œจ๎ฝ๎žŒ๎œž๎˜ƒ
electrically powering the unit.
10. ๎™—๎ฝ๎ž๎๎žŸ๎ฝ๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎ต๎œ‚๎๎ถ๎˜ƒ๎ž๎Ÿ‡๎ž๎žš๎œž๎ต๎˜ƒ๎ž๎Ÿ๎๎žš๎œ๎š๎˜ƒ
๎ฅพ๎œž๎Ÿ†๎žš๎œž๎žŒ๎ถ๎œ‚๎ฏ๎˜ƒ๎žš๎ฝ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ‚๎ž‰๎ž‰๎ฏ๎๎œ‚๎ถ๎œ๎œž๎ฅฟ๎˜ƒ๎œ‚๎žš๎˜ƒ
โ€œONโ€.
๎งฎ๎งฐ๎ฅ˜๎งฏ๎ฅ˜๎˜ƒ ๎˜„๎™จ๎™น๎˜ฏ๎˜พ๎˜ฏ๎˜„๎™š๎™บ๎˜ƒ๎˜’๎™‹๎™…๎™…๎˜œ๎˜’๎™ค๎˜ฏ๎™‹๎™…๎™ž๎˜ƒ
๎™จ๎™…๎˜˜๎˜œ๎™š๎˜ƒ๎™ค๎˜ฌ๎˜œ๎˜ƒ
๎™š๎˜œ๎™ž๎™—๎™‹๎™…๎™ž๎˜ฏ๎˜‘๎˜ฏ๎˜พ๎˜ฏ๎™ค๎™บ๎˜ƒ๎™‹๎˜ฆ๎˜ƒ๎™ค๎˜ฌ๎˜œ๎˜ƒ
๎™จ๎™ž๎˜œ๎™š๎ฅฌ๎˜ฏ๎™…๎™ž๎™ค๎˜„๎˜พ๎˜พ๎˜œ๎™š
All clamps to which reference is
๎ต๎œ‚๎œš๎œž๎˜ƒ๎๎ถ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œจ๎ฝ๎ฏ๎ฏ๎ฝ๎Ÿ๎๎ถ๎๎˜ƒ๎œž๎Ÿ†๎ž‰๎ฏ๎œ‚๎ถ๎œ‚๎žŸ๎ฝ๎ถ๎ž๎˜ƒ
are part of the 13 POLE removable
terminal board situated inside the
electric control board and con
-
๎ถ๎œž๎œ๎žš๎œž๎œš๎˜ƒ๎žš๎ฝ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎™„๎™‹๎˜˜๎™จ๎˜’๎™‹๎™…๎™ค๎™š๎™‹๎˜พ๎˜ƒ๎ฅพ๎ž๎œž๎œž๎˜ƒ๎œฎ๎๎žต๎žŒ๎œž๎ฅฟ๎ฅ˜๎˜ƒ
๎™ค๎š๎œž๎žŒ๎œž๎˜ƒ๎œ‚๎žŒ๎œž๎˜ƒ๎žš๎Ÿ๎ฝ๎˜ƒ๎žš๎Ÿ‡๎ž‰๎œž๎ž๎˜ƒ๎ฝ๎œจ๎˜ƒ๎œ๎ฝ๎ถ๎ถ๎œž๎œ๎žŸ๎ฝ๎ถ๎ž๎ฅ•๎˜ƒ๎ž๎œž๎œž๎˜ƒ๎Ÿ๎๎žŒ๎๎ถ๎๎˜ƒ
๎œš๎๎œ‚๎๎žŒ๎œ‚๎ต๎˜ƒ๎œ‚๎žš๎˜ƒ๎žš๎š๎œž๎˜ƒ๎œ๎ฝ๎žฉ๎ฝ๎ต๎˜ƒ๎ฝ๎œจ๎˜ƒ๎žš๎š๎œž๎˜ƒ๎ž‰๎œ‚๎๎œž๎ฅ—
24.3.1. SUMMER/WINTER REMOTE CONTROL
๎ฆˆ๎˜’๎ฅฌ๎˜ฆ๎ฆ‰
To prepare a summer/winter remote switch-
๎˜’๎ฝ๎ต๎ต๎๎ž๎ž๎๎ฝ๎ถ๎๎ถ๎ must be
performed with standard set-
tings. Only when the inspection
has been completed can the
functioning Set Point values by
changed.
Before start-up, power the unit
for at least 12-24 hours position-
ing the protection magnet circuit
breaker switch and the door lock
isolating switch at ON.
Make sure that the control panel
is off in order to allow the com-
pressor sup oil to heat.

Table of Contents

Related product manuals