MAINTENANCE INSTRUCTIONS
Subject to Export Control, see Cover Page for details. 2-1
2-1. SERVICE UPON RECEIPT
2-1-1. SERVICE UPON RECEIPT OF MATERIEL
A. Unpacking
Special-design packing material inside this shipping carton provides maximum protection for the Test
Set. Avoid damaging the carton and packing material during equipment unpacking. Use the following
steps for unpacking the Test Set.
Cut and remove the sealing tape on the carton top and open the carton.
Grasp the Test Set transit case firmly, while restraining the shipping carton, and lift the
equipment and packing material vertically.
Place the Test Set transit case and end cap packing on a suitable flat, clean and dry surface.
Remove the protective plastic bag from the Test Set transit case.
Place protective plastic bag and end cap packing material inside shipping carton.
Store the shipping carton for future use should the Test Set need to be returned.
B. Checking Unpacked Equipment
Use the following steps for checking the equipment.
Inspect the equipment for damage incurred during shipment. If the equipment has been
damaged, report the damage.
Check the equipment against the packing slip to see if the shipment is complete. Report all
discrepancies.
2-1-2. PRELIMINARY SERVICING AND ADJUSTMENT OF EQUIPMENT
Refer to the 3500 / 3500A Operation Manual for this information.