5 Testing
Before leaving the installation site, you want to test that the expected signals are
properly getting to the monitoring system. Perform at least the tests below and
confirm that the monitoring system and personnel properly received the correct
messages and understand what they mean.
5.1 Installation Site Checks
Some of the tests to be performed at the installation site require a response from a
Central Station person.
Trigger alarm conditions and confirm that the proper message is received at
the Central Station.
Cause fault conditions and confirm that the proper message is received at the
Central Station.
Activate devices that will utilize any accessories such as the IntelliTap to
confirm that these devices are functioning as desired.
Activate devices that will utilize any accessories such as the IntelliTap or
IntelliPro to confirm that these devices are functioning as desired.
Perform a Status Check, <Shift> + F4 to confirm good Status and required
NetCon.
Review Routing Table, <F4> to evaluate the listed IDs and values.
Ctrl + T to check current Zone state
5.2 Acknowledge delays
An Acknowledge delay occurs when a Packet Acknowledge is not received for a
transmitted Data Packet within the programmed Acknowledge Delay time. (Default
Ack Delay Time is 60 seconds).
Visit the Technical Support Knowledgebase for additional information on this and
many other subjects.