Installation
Agilent 5100 and 5110 ICP-OES User’s Guide 25
3. Installation
Agilent ICP-OES Instrument Overview 26
Instrument Status LED Color Coding 28
Front Power On/Off Button 28
ICP Expert Software 29
Connecting ICP Expert software to the ICP-OES 30
Performing a Detector and Instrument Calibration 30
Hardware Components Replacement 32
Torch Assembly and Disassembly 34
Accessories 38
The Agilent ICP-OES must be installed by an Agilent-trained, Agilent-
qualified or Agilent-authorized field service engineer.
You should have completed and returned the form in the Site
Preparation Guide stating that you have prepared the laboratory in
accordance with the requirements detailed in that manual. An
Agilent representative will then arrange a suitable installation date
with you.
Details for unpacking the instrument and what to do in case it has
been damaged in transit are also outlined in the Site Preparation
Guide.