Installation
Agilent 5100 and 5110 ICP-OES User’s Guide 29
Green blinking slow (1 Hz). The mains power module is
initializing and running through power up self-check, or is
shutting off the instrument.
Green blinking fast (4 Hz). Mains power module failed its
initialization power-up self-check, instrument is unusable. The
mains power supply is not adequate or the internal mains
module needs to be replaced.
Green constantly on indicates the instrument is switched on.
ICP Expert Software
The Agilent-trained, Agilent-qualified or Agilent-authorized field
service engineer will install the ICP Expert software for you during
the installation process. However, you may need to install the
software yourself at some later stage, for example if you change the
PC. Instructions are provided.
There are several installation scenarios:
Standalone or network Flat File
Standalone or network Database for 21 CFR Part 11 installations
Upgrading Standalone or Network Database ICP Expert
installations
Installation includes:
Installing the ICP Expert software
Installing the ICP Expert Help
Installing the LAN cable
Setting the instrument IP address
Installing and configuring SDA for 21 CFR Part 11 compliance
Installing and configuring SCM for 21 CFR Part 11 compliance
Completing a dark current scan and wavelength calibration