112 Agilent 1200 Preparative Pump User Manual
7 Maintenance
Overview of Maintenance and Repair
Overview of Maintenance and Repair
Figure 24 on page 112 shows the main assemblies of the preparative pump.
The pump heads and its parts do require normal maintenance (for example,
seal exchange) and can be accessed from the front (simple repairs). Replacing
internal parts will require to remove the module from its stack and to open the
top cover.
Figure 24 Overview of Repair Procedures