36 Agilent 1200 Preparative Pump User Manual
3 Installing the Pump
Installing the Preparative Pump
Installing the Preparative Pump
Parts required # Part number Description
1 G1361A Pump
1 Power cord, for other cables see text below and Cable Overview in the Service
Manual
1 Control Software (ChemStation, EZChrom, OpenLab, etc.) and/or
G4208A or
G1323B
a handheld controller (Instant Pilot or Control Module)
Preparations • Locate bench space.
• Provide power connections.
• Unpack the pump.
Instrument is partially energized when switched off
The power supply still uses some power, even if the power switch on the front panel
is turned off.
➔ To disconnect the module from line, unplug the power cord.
Use of unsupplied cables
Using cables not supplied by Agilent Technologies can lead to damage of the
electronic components or personal injury.
➔ Never use cables other than the ones supplied by Agilent Technologies to ensure
proper functionality and compliance with safety or EMC regulations.